Case Studies
See how MacroVac has delivered outstanding results for clients across Perth and beyond.

Critical valve replacements on DN1000 and DN600 pipelines at Belmont Pump Station required precise excavation within a heavily congested utilities corridor containing high-pressure water, communications, power, and existing water assets. With a scheduled shutdown in place, the environment posed a high risk where any contact with live services could result in major disruption, safety hazards,…

Protecting Critical Assets in a Live Utility Zone. METRONET alliance contractors required a non-mechanical excavation solution to protect live underground assets, including fuel, gas, and cable mains. MACROVAC’s dry vac system safely removed material without damaging infrastructure. The process eliminated ‘line of fire’ risks, reused excavated material for backfill, and ensured uninterrupted rail freight operations.…

Minimising Risk in a High-Stakes Environment. West Coast Civil used MACROVAC at Perth Airport to safely excavate around a live fuel main without damaging its protective coating. The dry vacuum process enabled precise material removal, reused in-situ backfill, and eliminated waste. Efficient suction technology ensured a safe, cost-effective solution with no disruption to airport operations.…